5G - Pre Trial - Power On Procedure                                   Home : www.sharetechnote.com

 

 

 

 

 

What happens when UE is powered on ?

 

    i) Power On UE

    ii) Search the frequency (Tune to the predefined frequency)

    iii) Detect PSS, SSS, ESS

    iv) Configure to decode xBCCH (331 - 9.1.1.1 for the details)

    v) Search xPBCH and decode MIB

    vi) Apply the configuration specified in brsTransmissionPeriod in MIB and decode BRS

    vii) Apply the configuration specified in ePBCHTransmissionPeriod in MIB and decode xSIB

    viii) forward cellIdentity (in xSIB) to higher layer

    ix)